Photo: © KPN
News | March 2025
KPN will switch off 2G only at the end of 2027
The Dutch telecommunications company KPN has postponed the switch-off of its 2G network by two years. The new date is 1 December 2027.
The Bucher Hydraulics site in Klettgau from the air. (Photo: © Stefanie Fahr)
February 2025
Bucher Hydraulics, producer of electrohydraulic system solutions, has opened a modern administrative building at its headquarters in Klettgau-Grießen (DE).
The move into the new building in Klettgau-Grießen was celebrated on 6 December 2024. The new building has 3500 m2 usable floor space on four floors and provides room for up to 180 employees.
According to Bucher Hydraulics, modern efficiency standards (KfW 40) ensure that the energy consumption is only 40 percent of a standard building. The building is heated with an air-to-water heat pump, which is supported by a photovoltaic system and consequently operates almost emission-free.
Apart from energy-efficient production halls and machinery, investments were also made in sustainable infrastructure such as solar system and charging stations for electric vehicles.
A modern education and training centre was erected next to the administrative building. A training workshop, training rooms and a flexible event room for up to 100 people are located on another 1200 m2.
More information: bucherhydraulics.com
Write a comment